MAXMECH · MMP SERIES
Mobile Concrete Plants MaxMECH
Wheel-mounted concrete mixing plants, ready for production within a few hours of arriving on site. Suitable for canal works, large-volume foundations, road bases, wind turbine foundations and large-scale construction.
8 – 45 m³/hCapacity range
3 modelsMMP08 · MMP15 · MMP30
200 mm PCCSingle foundation
Key Features
2 / 3 / 4 aggregate bins
Does not require a solid foundation
Electric vibrators for sand and cement
Powerful turbo-pan mixer
PLC and HMI touchscreen
Easy and fast delivery
Maxmech MMP08-2S
8 m³/h
Capacity: 8 m³/h
Mixer (dry/concrete): 500 / 300 l
Mixer motor: 15 hp · 3 load cells
Aggregate bins: 2 pcs (2×1 m³)
Cement bin: 0.1 m³, inclined screw 5 hp
Water tank: 125 l, 1 pump
Required power: 36 kVA
Running gear: fixed + steering axle, up to 30 km/h
Maxmech MMP15-3S
15 m³/h
Capacity: 15 m³/h
Mixer (dry/concrete): 1200 / 800 l
Mixer motor: 25 hp · 3 load cells
Aggregate bins: 3 pcs (3×2.5 m³)
Cement bin: 1.0 m³, vibrator + inclined screw
Tanks: water 200 l + additives 125 l
Required power: 62,5 kVA
Running gear: fixed + steering axle, up to 30 km/h
Maxmech MMP30-4S
30 – 45 m³/h
Capacity: 30 – 45 m³/h
Mixer (dry/concrete): 2200 / 1450 l
Mixer motor: 40 hp · 4 load cells
Aggregate bins: 4 pcs (4×4.5 m³)
Cement bin: 1.0 m³, vibrator + inclined screw
Tanks: water 750 l + additives 125 l
Required power: 100 kVA
Running gear: 2 fixed + steering axle, up to 30 km/h
MaxMech MMP30-4S — on-site installation
Why MaxMech MMP30-4S
- Full mobility — installation of a steel frame with wheels, ready to operate with no need for a foundation
- Precise automatic dosing and mixing — with memory for 99 recipes and printing of full documentation
- Over 30 years of MAXMECH experience and reliable after-sales service through OVS Trading Co
- Warranty 1 year from commissioning, up to 13 months total
Suitable Applications
RDRoad Construction
RCResidential Construction
ISIndustrial Sites
IPInfrastructure Projects
PEPrecast Element Production
BRBridges & Structures
EWEarthworks
LSLandscaping
Control and computer equipment — common to all three models
Fully automatic operating cycle, started with the press of a single key — the mixing cycle takes 2–3 minutes depending on the set recipe and concrete slump. The built-in printer documents every batch with a unique number and the exact quantities of aggregates, cement, water and additives. The computer controls the aggregate bins, cement silos, conveyor belts, water pump and additive pump, with the ability to store and recall 99 recipes.
Need help choosing a model?
Contact us →